Ga naar de inhoud
  • Over
    • We are Mercon
    • Management Mercon
    • Certificaten en documenten
  • HSEQ
    • Intro HSEQ
    • Duurzaamheid
    • Prepare & Prevent
    • Safety Culture Ladder
  • Projecten
  • Nieuws
  • Werken bij
  • Contact
  • Vacatures
  • Over
    • We are Mercon
    • Management Mercon
    • Certificaten en documenten
  • HSEQ
    • Intro HSEQ
    • Duurzaamheid
    • Prepare & Prevent
    • Safety Culture Ladder
  • Projecten
  • Nieuws
  • Werken bij
  • Contact
  • Vacatures

12 juli 2019

|

MERCON WINS KARGO BRIDGE PROJECT

MERCON WINS KARGO BRIDGE PROJECT

CONSTUCTION & REFURBISHMENT OF 8 BRIDGES

On 15 July 2010, Mercon Steel Structures and KWS Infra have been awarded the construction and refurbishment contract for the KARGO bridge project by the Dutch Ministry of Transport, Public Works and Water Management.

KARGO is an abbreviation of “Kunstwerken Amsterdam-Rijnkanaal Groot Onderhoud” meaning large maintenance on bridges in the Amsterdam-Rhine Canal area.

The contract values EUR 87 million and encompasses extensive refurbishment of the following eight steel arch bridges which were all built in the period 1937 until 1976.
• Amsterdam bridge
• Weesper bridge
• Loenersloot bridge
• Breukelen bridge
• Juthphase bridge
• Schalkwijk bridge
• Buiten-IJ bridge
• Overeind bridge

The aim is to bring all bridges up to today’s standards. Some of the bridges will be completely renewed. In several cases even a temporary 140m long bridge will be built to minimize congestion. Furthermore all bridges will be jacked up several inches to facilitate 4-level container shipment which will be one of the key improvements.

Next to competitive pricing, quality, safety and experience, minimizing congestion for both waterway and road traffic was a key factor in the award of the contract. The combination Mercon-KWS offered extensive experience in the building of new bridges such as the High Speed Train bridge (HSL) built by Mercon and the renovation of the Haringvliet bridge by KWS Infra.
The work is planned from Q3-2010 until Q4-2016.

Vorige
Volgende
Linkedin

Hoofdkantoor

Krinkelwinkel 6-8
4202 LN Gorinchem
The Netherlands

  • +31 (0)85 077 3000
  • mercon@mercon.com
More contact details

Kantoor Velsen-Noord

Rooswijkweg 92
1951 MJ Velsen-Noord
The Netherlands

  • +31 (0)85 0773021
  • mercon@mercon.com
More contact details

Blijf op de hoogte

  • Nieuws
  • Projecten
  • Werken bij
  • Nieuws
  • Projecten
  • Werken bij

Webdesign Swipe Media

|

Privacyverklaring

|

Extranet

|

Webmail

  • Over
    • We are Mercon
    • Management Mercon
    • Certificaten en documenten
  • HSEQ
    • Intro HSEQ
    • Duurzaamheid
    • Prepare & Prevent
    • Safety Culture Ladder
  • Projecten
  • Nieuws
  • Werken bij
  • Contact
  • Vacatures

Neem contact op

  • +31 (0)85 077 3000
  • info@mercon.com